ArcGIS REST Services Directory Login | Get Token

Generate KML (MapViewer/Facility_Inspections_2019)

Layers:
    Facility Inspections 2020(24)
    Facility Inspections 2019(0)
      Alligatoring(1)
      Broken Curb(2)
      Broken Interlock(3)
      Condition over 20mm(4)
      Condition under 20mm(5)
      Cracked Condition Major(6)
      Cracked Condition Minor(7)
      Cracks(8)
      Heaved Curb(9)
      Pothole(10)
      Repaint Bollards/Access Gates(11)
      Repaint Fire Hydrant(12)
      Repaint HC Symbol(13)
      Repaint Parking Curbs(14)
      Repaint Parking Lines(15)
      Repair HC Sign(16)
      Reset Parking Club(17)
      Settled Interlock(18)
      Settled/Raised CB(19)
      Settled/Raised MH(20)
      Settlements(21)
      Standing Water(22)
      Surface Condition(23)
Layer Options: